Emerson Network Power Introduces New Liebert NXL UPS models

by Marissa Donatone on 3/5/15 9:32 AM

Mission Critical Magazine, dives into the new Emerson Network Power NXL UPS model. 

“Today’s dynamic data centers require equally dynamic infrastructure solutions that are designed for continuous availability without impairing data center cost management,” said Peter Panfil, global vice president AC Power, Emerson Network Power. “The Liebert NXL 400kVA, 575-600V UPS provides data center professionals an optimized power solution that is quicker to install, highly efficient and cost-effective, while protecting their IT applications with the most reliable UPS system in the industry.”

Take a look at the article here

liebert-nxl-online-ups-1100_medium

Read More

Topics: Emerson Network Power, data center infrastructure, Battery, Efficiency, clean energy

Take a Virtual Tour of Liebert's SmartRow and SmartAisle

by Marissa Donatone on 2/26/15 9:00 AM

smartaisletour smartrowtour

It's time to take two great virtual walkthrough tours of Liebert's SmartAisle and SmartRow solutions for Data Centers! 

The SmartAisle infrastructure solution optimizes infrastructure deployment and management with an intelligent row-based system that integrates data center racks, power, row cooling, aisle containment, monitoring and control technologies for spaces with up to 40 racks.

The SmartRow infrastructure solution solves a problem all too common to IT management: addressing IT needs without building new data center space. Think of the SmartRow approach as a data center in a row--a simple, fully integrated row-based infrastructure. The SmartRow offering combines up to six data center racks--with precision cooling, UPSs, power management, monitoring and control technologies, and fire suppression--all in an enclosed system.

CLICK HERE To take the Tours! 

For more information on Smart Solutions visit: Emersonnetworkpower.com

 

Read More

Topics: rack, Emerson Network Power, data center infrastructure, data center design, Containment, Green Technology, Efficiency, cooling, Liebert, smart solutions

Five Best Practices in Enterprise Data Center Design

by Emerson Network Power on 1/15/15 8:46 AM

iCOM_supersaver_CW-units

As many of us know, in traditional data centers, approximately one-half of the energy consumed goes to support IT equipment while the other half is used by support systems.

Moreover, complexity and critical conditions have increased in recent years.  Since the cost of downtime is high (a full shutdown costs more than € 500,000, source: 2011 National Study on Data Center Downtime), availability of IT capacity is generally an important metric on which data centers are evaluated. Today, however, data centers must also operate efficiently while providing flexibility to quickly adapt to changes in computing demand.

Emerson Network Power conducted a systematic analysis of the energy consumed in data centers and of the various approaches that lead to energy conservation.

We have identified five best practices that represent proven approaches to improve overall data center performance:

1. Maximize the return temperature at the cooling units to improve capacity and efficiency;
2. Match cooling capacity and airflow with IT loads;
3. Utilize cooling designs that reduce energy consumption;
4. Enable data center monitoring to improve capacity, efficiency and availability;
5. Utilize local design and service expertise to extend equipment life, reduce costs and address your data center’s unique challenges.

Do you know further practices that can serve as the foundation for data center design?

If you want to learn more, read the white paper.

You can also read more about SmartAisle.

This article was written by: Matej Kordisch, Emerson Network Power. To read more Blogs by Emerson, please visit: http://blog.emersonnetworkpower.com/ 

Read More

Topics: Emerson Network Power, Data Center, data center design, data center infrastructure management, energy, Uptime, monitoring, the green grid, cooling

Speed, Flexibility and the Data Center

by Emerson Network Power on 11/25/14 11:45 AM

Kollengode Anand | November 20, 2014 | Emerson Network Power

iStock_000019241308Small

It’s no longer enough to be dependable if you’re running a data center.  With greater demands being placed by customers, both external and internal, data center administrators are required to be both dependable and fast. Consider these facts, from our “State of the Data Center” report last year:

  • The equivalent of one of every nine persons on the planet uses Facebook.
  • We generated 1.6 trillion gigabytes of data last year. That’s enough data to give every single person on Earth eight 32-gigabyte iPhones, and it’s an increase of 60 percent in just two years.
  • Every hour, enough information is created to fill more than 46 million DVDs.
  • Global e-Commerce spending topped $1.25 trillion in 2013.

It’s always been important to respond to your customers, of course, but now there are more of them, demanding more information, and more quickly:  the report says that if the online video they are watching buffers for more than five seconds, 25 percent of viewers drop off.  And if the video buffers for more than 10 seconds, half of them are gone.

Oh, and did we mention that the average cost of a data center outage now runs more than $900,000…an increase of one-third in just two years?

Which is why it’s critical for administrators to be able to flexibly configure their data centers, and to be able to react rapidly when requirements change, or when there’s a problem.  We’ve found that a unified approach to the entire infrastructure is the best way of handling these situations.  Whether it’s heating and cooling, power, servers, software, or more, the ability to administer data center operations in a real-time manner has become more imperative than ever.

It’s one of the key elements in the development of the dynamic data center, and in being able to easily manage changes and maintain an optimal environment.

We’ll be at the Gartner Data Center, Infrastructure & Operations Management Conference in Las Vegas in a couple of weeks, at booth #211, showing off the equipment and software that we’ve developed to help you make your business as dynamic as your data center.  We’ll also be speaking about where our clients believe the data center is headed more than ten years from now.   Their input has proven critical in the past, and their thinking is helping us develop the solutions that will solve their challenges both today and tomorrow.

For More Blogs by Emerson Network Power- Click Here

Read More

Topics: Emerson Network Power, Data Center, cloud computing, 7x24 exchange, Thermal Management, DCIM, Uptime, sustainability, clean energy, monitoring, Trellis

When Should You Consider Building a New Data Center? Case Study: Paragon Internet Group

by Emerson Network Power on 11/19/14 9:25 AM

man-in-a-server-room_MG_4163

IT departments today are all about speed – adding more applications faster to satisfy voracious global appetites for mobile, social media, streaming video and other resource-intensive applications. These applications must be available, regardless of their impact on critical infrastructure performance. If growth is stretching your resources too thin, you must take action to ensure availability. But because IT organizations are pressured to lower costs, you have to build an unassailable business case when deciding how to expand.

A variety of solutions are available for upgrading and expanding your critical infrastructure, including building a new data center, but how do you know which option is best?

Because you can take many actions short of building a new data center to improve your critical infrastructure, you may want to consider building new only as a last resort.
Building new is expensive and difficult. Factors such as getting a loan, finding a location and determining if you can get fiber optic cable all come into play. It can take three years before the new space is operational, and managing logistics for a move is challenging.

Still, there are times when building new is a good choice:

  • Your business growth is through acquisition, and you need to consolidate a number of acquired data center You may have to build new to accommodate them.
  • You don’t have a disaster recovery site. You can build new and use the old facility for this purpose.
  • Your equipment is so old and poorly maintained that it’s not worth it to upgrade. Building new is an opportunity to take advantage of new, more efficient technologies.

 

Here is an interesting case study about Paragon Internet Group in the UK.

What about you? Have you assessed and optimized your existing critical infrastructure or have you preferred to invest in a new data center project?

Author: Paul Russell, Emerson Network Power. 
To view more Blogs by ENP, CLICK HERE

Read More

Topics: Emerson Network Power, Data Center, cloud computing, Efficiency, Energy Logic, Thermal Management, DCIM, capacity

Subscribe to Our Blog